Solar + Storage Spain 01
A 5 MWp solar park with a 5 MW / 10 MWh battery in Castilla-La Mancha. The battery stores midday solar output so part of it can be sold in the evening, when prices have tended to be higher.
- Target return
- 10.00%
- Term
- 5 yrs
- Capacity
- 5 MWp + 10 MWh
- Issuance
- €3.6m
About this issuance
Solar + Storage Spain 01 combines a ground-mounted 5 MWp solar park with a co-located 5 MW / 10 MWh lithium iron phosphate battery. The site receives around 2,050 kWh/m² of solar irradiation a year. Without storage, a solar park has to sell its power when the sun shines, often when prices are lowest. The battery lets the project shift some of those sales into the evening peak. Each Energy Unit gives economic exposure to around 550 Wp of solar capacity plus a proportional share of the battery and common infrastructure. The project is professionally built, operated and insured on your behalf.
2,050 kWh/m²
Solar irradiation
Per year
8,900 MWh
Expected generation
Per year, base case
5 MW / 10 MWh
Battery
2-hour duration
Granted
Grid connection
Investment highlights
- Around 2,050 kWh/m² of solar irradiation a year, among the highest in Europe
- A 10 MWh battery lets the project sell part of its output in the evening peak
- Investors receive a 10% preferred return before the sponsor shares in profits
- Grid connection granted and land secured under a 30-year lease
Preferred return p.a. · distributed quarterly
Capital at risk. Joining The Green Club is free; investing requires completing investor verification and is subject to the project's offering document and terms. Target returns are not guaranteed.